Detailed Form of Cost Analysis
Blank form for submitting Detailed Cost Analysis to the BCIS, to be completed in accordance with the Principles, Instructions and Definitions of the Standard Form of Cost Analysis.
The complete Detailed Cost Analysis to be accompanied by a simple plan and elevation drawing of the scheme if available.
|
Cost Analysis for: |
_______________________________________________________ |
|
Submitted by: |
_______________________________________________________ |
|
Prepared by: |
_______________________________________________________ |
Agreement obtained for submission to BCIS: Yes / No
BCIS USE ONLY
|
File No: |
___________________ |
Analysis No: |
___________________ |
|
Submitted to BCIS on: |
__________________ |
Drawings: |
___________________ |
|
Entered by: |
___________________ |
Date: |
___________________ |
|
Checked by: |
___________________ |
Date: |
___________________ |
BCIS Ltd, 12 Great George Street, Parliament Square, London SW1P 3AD
. Tel: 020 7695 1500©
RICS
|
HEADING |
BCIS Use Only | ||||
|
Analysis Reference No: |
|||||
|
Job title: |
______________________________________________________________ | ||||
|
Building function: |
_________________________________________ |
||||
|
Type of work: |
_________________________________________ |
||||
|
Date for receipt of tender: |
_________________________________________ |
||||
|
Date of tender/ base month: |
_________________________________________ |
||||
|
Date of acceptance: |
_________________________________________ |
||||
|
Date of possession: |
_________________________________________ |
||||
|
Complex contract: |
Yes |
[] |
No |
[] |
|
|
Main form of construction: |
Steel frame Structural brickwork |
[] [] |
Concrete frame Timber frame |
[] [] |
|
|
Primary |
____________________ |
||||
|
No of Storeys: |
Secondary |
____________________ |
|||
|
Basement |
____________________ |
||||
|
Gross floor area: |
_______________________________________m2 |
||||
|
PROJECT DESCRIPTION (approximately 57 words) |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
LOCATION AND SITE |
BCIS Use Only | ||
|
Town and county: |
___________________________________________ |
Grid ref: |
|
|
Local authority district: |
___________________________________________ |
Loc code: |
|
|
Site conditions: |
|||
|
Contour: |
Level/Gently Sloping/Steeply Sloping/Undulating |
1 ____ ____ | |
|
Ground conditions: |
Good/Moderate/Bad |
2 ____ ____ | |
|
Excavation: |
Above/Below Water Table/In Running Water |
3 ___ ____ | |
|
Existing state: |
Green Field/Demolition/Demolition by Others/Infill |
4 ___ ____ | |
|
Working space: |
Unrestricted/Restricted/Highly Restricted |
5 ___ ____ | |
|
Access: |
Unrestricted/Restricted/Highly Restricted |
6 ____ ____ | |
|
Site description: |
_______________________________________________________________ | ||
|
_______________________________________________________________ | |||
|
_______________________________________________________________ | |||
|
_______________________________________________________________ | |||
|
_______________________________________________________________ | |||
|
MARKET CONDITIONS (approximately 57 words) |
BCIS Use Only | |
|
____________________________________________________________ |
||
|
____________________________________________________________ |
Project TPI: |
|
|
____________________________________________________________ | ||
|
____________________________________________________________ |
||
|
____________________________________________________________ |
| |
| ____________________________________________________________ |
Index Base: |
|
|
____________________________________________________________ | ||
|
____________________________________________________________ |
| |
|
CONTRACT PARTICULARS |
BCIS Use Only | |||
|
Client name: |
_____________________________________ |
|||
|
Tender documents: |
_____________________________________ |
|||
|
Selection of contractor: |
_____________________________________ |
|||
|
No of tenders: |
Issued: |
_______________________ |
||
|
Received: |
_______________________ |
|||
|
Type of contract: |
_____________________________________ |
|||
|
Cost fluctuations: |
_____________________________________ |
|||
|
Contract period: |
Stipulated by client: |
...................weeks |
| |
|
Offered by contractor: |
...................weeks |
| ||
|
Agreed: |
...................weeks |
| ||
|
Tender amended: (please give details) |
_____________________________________ |
|||
|
_____________________________________ | ||||
|
COMPETITIVE TENDER LIST |
|
|
1)______________________________________ |
6)______________________________________ |
|
2)______________________________________ |
7)______________________________________ |
|
3)______________________________________ |
8)______________________________________ |
|
4)______________________________________ |
9)______________________________________ |
|
5)______________________________________ |
10)_____________________________________ |
|
BREAKDOWN OF COSTS | |||
|
Contract: |
Building (only if complex contract): | ||
|
Measured work |
_______________________ |
Measured work |
_______________________ |
|
Prime cost sums |
_______________________ |
Prime cost sums |
_______________________ |
|
Provisional sums |
_______________________ |
Provisional sums |
_______________________ |
|
Preliminaries |
_______________________ |
Preliminaries |
_______________________ |
|
Contingencies |
_______________________ |
Contingencies |
_______________________ |
|
Contract sum |
_______________________ |
Contract sum |
_______________________ |
|
ACCOMMODATION AND DESIGN FEATURES (approximately 95 words) |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
__________________________________________________________________________________ |
|
AREAS | |||
|
Basement: |
__________________m2 |
Area of external envelope: (ext.walls, windows & doors) |
_____________m2 |
|
Ground floor: |
__________________m2 |
| |
|
Upper floors: |
__________________m2 |
Average storey height: |
|
|
Total*: |
__________________m2 |
Basement: |
_______._____m |
|
|
Ground floor: |
________._____m | |
|
|
Upper floors: |
________._____m | |
|
Usable: |
__________________m2 |
| |
|
Circulation: |
__________________m2 |
Internal cube: |
_____________m3 |
|
Ancillary: |
__________________m2 |
Spaces not enclosed: |
_____________m2 |
|
Internal divisions: |
__________________m2 |
| |
|
Total*: |
__________________m2 |
Number of units: |
_______________ |
|
*Note these totals should equal the gross floor area given above. | |||
|
FUNCTION AND SHAPE | ||||||
|
Functional Units |
BCIS use only | |||||
|
Quantity |
Unit/ Description (e.g. No. of Beds) |
Code | ||||
|
1) |
_______________ |
______________________________ |
_______________ | |||
|
2) |
_______________ |
______________________________ |
_______________ | |||
|
3) |
_______________ |
______________________________ |
_______________ | |||
|
Design Shape |
||||||
|
|
Storeys |
Percentage |
Storeys |
Percentage | ||
|
1) |
_______________ |
________._______ |
4) |
_______________ |
________.________ | |
|
2) |
_______________ |
________._______ |
5) |
_______________ |
________.________ | |
|
3) |
_______________ |
________._______ |
6) |
_______________ |
________.________ | |
ELEMENT COST ANALYSIS
|
Element |
Total Cost of Element £ |
Cost per m2 GFA £/m2 |
Element Unit |
Cost Included in Another Element (state element) | ||
|
Quantity |
Unit | |||||
|
1 |
Substructure |
|
|
|
| |
|
2 |
Superstructure |
|
|
|
| |
|
2A |
Frame |
|
|
|
| |
|
2B |
Upper Floors |
|
|
|
| |
|
2C |
Roof |
|
|
|
| |
|
2D |
Stairs |
|
|
|
| |
|
2E |
External Walls |
|
|
|
| |
|
2F |
Windows & External Doors |
|
|
|
| |
|
2G |
Internal Walls & Partitions |
|
|
|
| |
|
2H |
Internal Doors |
|
|
|
| |
|
|
Group Element Total |
|
|
|
| |
|
3 |
Finishes |
|
|
|
| |
|
3A |
Wall Finishes |
|
|
|
| |
|
3B |
Floor Finishes |
|
|
|
| |
|
3C |
Ceiling Finishes |
|
|
|
| |
|
|
Group Element Total |
|
|
|
| |
|
4 |
Fittings & Furnishings |
|
|
|
| |
|
|
Carried Forward |
|
|
|
| |
|
|
Brought Forward |
|
|
|
| |
|
5 |
Services |
|
|
|
| |
|
5A |
Sanitary Appliances |
|
|
|
| |
|
5B |
Services Equipment |
|
|
|
| |
|
5C |
Disposal Installation |
|
|
|
| |
|
5D |
Water Installation |
|
|
|
| |
|
5E |
Heat Source |
|
|
|
| |
|
5F |
Space Heating |
|
|
|
| |
|
5G |
Ventilating System |
|
|
|
| |
|
5H |
Electrical Installation |
|
|
|
| |
|
5I |
Gas Installation |
|
|
|
| |
|
5J |
Lift and Conveyors |
|
|
|
| |
|
5K |
Protective Installation |
|
|
|
| |
|
5L |
Communications Installations |
|
|
|
| |
|
5M |
Special Installations |
|
|
|
| |
|
5N |
BWIC with Services |
|
|
|
| |
|
5O |
Profit and Attendant Services |
|
|
|
| |
|
|
Group Element Total |
|
|
|
|
|
|
|
Building Sub-Total |
|
|
|
|
|
|
6 |
External Work |
|
|
|
|
|
|
6A |
Site Works |
|
|
|
| |
|
6B |
Drainage |
|
|
|
| |
|
6C |
External Services |
|
|
|
| |
|
6D |
Minor Buildings |
|
|
|
| |
|
|
Group Element Total |
|
|
|
|
|
|
7 |
Preliminaries |
|
|
|
|
|
|
8 |
Contingencies (inc. dayworks) |
|
|
|
| |
|
|
Contract Sum |
|
|
|
| |
ELEMENTAL SPECIFICATION AND DESIGN NOTES
|
|
BCIS Use Only | |||
|
Table |
Code |
Translation | ||
|
1 |
SUBSTRUCTURE: |
Lowest floor slab | ||
|
|
1 7 |
1 Q 4 |
Insitu concrete bed | |
|
|
1 7 |
4 Q 4 |
Basement, insitu concrete | |
|
|
1 7 |
2 F 2 |
Suspended PCC | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
Foundations | ||
|
|
1 8 |
4 Q 4 |
Insitu concrete pad | |
|
|
1 8 |
6 Q 4 |
Insitu concrete strip | |
|
|
1 8 |
7 Q 4 |
Insitu concrete raft | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
Piling | ||
|
|
1 9 |
0 |
Undefined piling | |
|
|
1 9 |
2 Q 4 |
Replacement insitu concrete | |
|
|
|
|
| |
|
|
|
|
|
|
|
2A |
Frame: |
Frame | ||
|
|
2 8 |
2 H 2 |
Steel column and beam | |
|
|
2 8 |
2 Q 4 |
Insitu concrete col. & beam | |
|
|
2 8 |
4 H 2 |
Steel portal frame | |
|
|
|
|
| |
|
|
|
|
|
|
|
2B |
Upper floor: |
Upper floor | ||
|
|
2 3 |
2 Q 4 |
Insitu concrete slab | |
|
|
2 3 |
3 F 2 |
PCC composite | |
|
|
2 3 |
3 I 1 |
Timber composite | |
|
|
|
|
| |
|
|
|
|
|
|
|
2C |
Roof: |
Roof structure | ||
|
|
2 7 |
1 I 2 |
Softwood flat | |
|
|
2 7 |
2 I 2 |
Softwood pitched | |
|
|
2 7 |
1 H 2 |
Steel flat | |
|
|
2 7 |
2 H 2 |
Steel pitched | |
|
|
|
|
| |
|
|
|
Roof finishes | ||
|
|
4 7 |
5 F 2 |
Concrete/clay tiles | |
|
|
4 7 |
4 H 2 |
Cladding on frame, steel | |
|
|
|
|
| |
|
|
|
4 7 |
7 |
Patent glazing |
|
|
|
|
| |
|
2D |
Stairs: |
Stairs | ||
|
|
2 4 |
1 F 2 |
PCC straight | |
|
|
2 4 |
1 Q 4 |
Insitu concrete straight | |
|
|
2 4 |
1 I 2 |
Softwood straight | |
|
|
2 4 |
1 H 2 |
Steel, straight | |
|
|
|
|
| |
|
|
|
|
|
|
|
2E |
External Walls: |
External walls | ||
|
|
2 1 |
1 G 2 |
Loadbearing brick | |
|
|
2 1 |
3 G 2 |
Non-loadbearing brick | |
|
|
2 1 |
F 4 |
Block | |
|
|
2 1 |
4 |
Curtain walling | |
|
|
2 1 |
6 |
Cladding | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
External wall finishes | ||
|
|
4 1 |
1 Q 4 |
Render/roughcast | |
|
|
4 1 |
6 |
Cladding | |
|
|
|
|
| |
|
|
|
|
|
|
|
2F |
Windows and External Doors: |
Windows and external doors | ||
|
|
3 1 |
H 4 |
Aluminium | |
|
|
3 1 |
I 2 |
Softwood | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2G |
Internal Walls and Partitions: |
Internal walls | ||
|
|
2 2 |
F 4 |
Block | |
|
|
2 2 |
1 F 4 |
Loadbearing block | |
|
|
2 2 |
2 F 4 |
Non-loadbearing block | |
|
|
2 2 |
2 I 1 |
Non-load. timber stud | |
|
|
2 2 |
4 |
Proprietary partitions | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2H |
Internal Doors: |
Internal doors | ||
|
|
3 2 |
3 I 2 |
Softwood or flush | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3A |
Internal Wall Finishes: |
Internal wall finishes | ||
|
|
4 2 |
1 F 7 |
Plasterboard | |
|
|
4 2 |
1 R 2 |
Plaster | |
|
|
4 2 |
1 G 2 |
Clay/Concrete tiles | |
|
|
4 2 |
1 V |
Paint only | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3B |
Floor Finishes: |
Floor finishes | ||
|
|
4 3 |
1 N 6 |
Plastic tiles/sheet | |
|
|
4 3 |
1 G 2 |
Clay tiles | |
|
|
4 3 |
1 J 6 |
Carpet | |
|
|
4 3 |
1 I 7 |
Independent floor | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Secondary floors | ||
|
|
3 3 |
1 |
Access floor | |
|
|
|
|
| |
|
3C |
Ceiling Finishes: |
Ceiling finishes | ||
|
|
4 5 |
1 F 7 |
Plasterboard | |
|
|
4 5 |
1 R 2 |
Plaster | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Suspended ceiling | ||
|
|
3 5 |
1 |
Undefined | |
|
|
3 5 |
1 M 1 |
Mineral fibre | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Fittings: |
Fittings | ||
|
7 0 |
0 |
Normal for building type | ||
|
7 0 |
8 6 |
Special for disabled | ||
|
|
|
| ||
|
|
|
|
| |
|
|
|
|
| |
|
|
|
|
| |
|
5A |
Sanitary Appliances: |
Sanitary fittings | ||
|
|
7 4 |
0 |
Normal for building type | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
5B |
Services Equipment: |
Services installation | ||
|
|
6 7 |
1 5 |
Kitchen equipment | |
|
|
6 7 |
1 8 |
Laundry equipment | |
|
|
|
|
| |
|
|
|
|
|
|
|
5C |
Disposal Installation: |
Waste disposal | ||
|
|
5 2 |
3 |
Soil and waste | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5D |
Water Installation: |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5E |
Heat Source: |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5F |
Space Heating and Air Treatment |
Space heating | ||
|
|
56 |
2 W 4 |
Central, HW Gas | |
|
|
56 |
1W1 |
Local, Electrical | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Air conditioning and ventilation | ||
|
|
57 |
0 |
Air cond. undefined | |
|
|
57 |
1 |
Heating & Cooling Central | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
5G |
Ventilating System: |
Air conditioning and ventilation | ||
|
|
57 |
5 |
Mech. ventilation central | |
|
|
57 |
6 |
Mech. ventilation local | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
5H |
Electrical Installation: |
Electrical installation | ||
|
|
6 0 |
1 |
Power and light | |
|
|
6 0 |
1 9 |
Power and light PC | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
6 7 |
2 3 |
Emergency lighting/power |
|
|
|
|
| |
|
5I |
Gas Installation: |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
5J |
Lift and Conveyor Installation: |
Lift and conveyor | ||
|
|
6 6 |
1 9 |
Lifts, PC Sum | |
|
|
6 6 |
1 |
Lifts | |
|
|
|
|
| |
|
|
|
|
|
|
|
5K |
Protective Installation: |
Security installation | ||
|
|
6 8 |
4 |
Fire fighting manual | |
|
|
6 8 |
3 |
Sprinklers | |
|
|
6 8 |
7 |
Lightning Protection | |
|
|
|
|
| |
|
|
|
|
|
|
|
5L |
Communications Installation: |
6 8 |
1 |
Burglar alarms |
|
|
6 8 |
2 |
Fire alarms | |
|
|
6 8 |
1 1 |
CCTV | |
|
|
6 8 |
1 2 |
Panic/attack alarms | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
Special installation | ||
|
|
6 7 |
21 |
Public address | |
|
|
6 7 |
34 |
Data cabling | |
|
|
6 7 |
38 |
Communal TV/satellite | |
|
|
|
|
| |
|
5M |
Special Installations: |
6 7 |
1 |
Window cleaning |
|
|
6 7 |
3 |
Medical/lab gas | |
|
|
|
3 1 |
Building Management Sys. | |
|
|
|
|
| |
|
|
|
|
|
|
|
5N |
BWIC with Services: |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5O |
Profit and Attendance on Services |
|
| |
|
|
% of the remainder of the Services amount. |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
6A |
Site Works: |
External works (Table 90) | ||
|
|
9 0 |
1 |
Site preparation | |
|
|
9 0 |
2 F 2 |
Paving PCC | |
|
|
9 0 |
2 S 5 |
Paving macadam | |
|
|
9 0 |
2 W |
Landscape/Plane | |
|
|
9 0 |
4 G 2 |
Enclosures, brick | |
|
|
9 0 |
4 H 2 |
Enclosures, steel | |
|
|
9 0 |
4 I 1 |
Enclosures, timber | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6B |
Drainage: |
9 0 |
5 |
Drainage |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6C |
External Services: |
9 0 |
6 |
External services |
|
|
9 0 |
6 1 |
External lighting | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6D |
Minor Building Works: |
9 0 |
7 |
Minor buildings |
|
|
9 0 |
8 |
Inc. other buildings | |
|
|
9 0 |
9 |
Work to existing building | |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Preliminaries: |
|
| |
|
|
% of remainder of Contract Sum (excluding Contingencies) |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Contingencies: |
|
| |
|
|
% of remainder of Contract Sum (excluding Preliminaries) |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
CREDITS |
||
|
Submitted by: |
||
|
Client: |
||
|
Architect: |
||
|
Quantity Surveyor: |
||
|
Planning Supervisor: |
||
|
Engineers - |
Mechanical: |
|
|
Electrical: |
||
|
Structural: |
||
|
|
|
|
|
|
| |
|
General Contractor: |
| |
|
ASSOCIATED ANALYSES | |||
|
1 |
|
5 |
|
|
2 |
|
6 |
|
|
3 |
|
7 |
|
|
4 |
|
8 |
|