Approach | BCIS Information | Case Study Design Information
Powerpoint slides
Andy Ross | Dave Jaggar | Jim Smith | Peter Love
Quantity Surveying | Construction Management | Architecture | Civil Engineering | Construction I.T.
Building Organisations- Carillion plc | Building Organisations - McCarthy and Stone | Architects | Engineers - Betchel
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

Picture of the textbook associated with the site


Building Design Cost Management

Case Study - BCIS Information - Available Information - Cost

 

Electronics Factory D A - 1 - 2,865
Building Function : 275.5 - Factories for electronics, computers, or the like
Type of Work : New build
Gross Floor Area : 2,865 m2
Job Title : Electronics Factory, Northern Ireland
Location : Northern Ireland
District :  
Grid Reference :  
Dates : Receipt : 13-Apr-1995
  Base : 13-Apr-1995
  Acceptance : 10-May-1995
  Possession : 11-May-1995
Project Details : Single storey factory building, 95x28x4.4m, with attached boiler and compressor house, 9.4x18m, ready for occupation. External works include macadam and insitu concrete paving, chain link fencing, landscaping, services, drainage, security hut and chemical store.
Site Conditions : Level green field site with moderate ground conditions. Excavation above water table. Unrestricted working space and access.
Market Conditions : Project tender price index: 75 on 1985 BCIS Index Base
Client :  
Tender Documentation : Bill of Quantities
Selection of Contractor : Selected competition
No of Tenders : Issued : 6    Received : 6
Contract : GC/Wks/1 edition 2
Contract Period ( mths ) : Stipulated : 4  Offered : -  Agreed : 4
Cost Fluctuations : Fixed
Tender List : £ 1,810,990 -  
  £ 1,858,401 2.6%  
  £ 1,874,212 3.5%  
  £ 1,899,439 4.9%  
  £ 1,914,045 5.7%  
  £ 1,953,259 7.9%  
Contract Breakdown :   
Measured Work £ 1,078,990   
Provisional Sums £ 51,000   
Prime Cost Sums £ 509,200   
Preliminaries £ 131,800   
Contingencies £ 40,000   
Contract Sum £ 1,810,990   
Accomodation and Design Features : Factory with offices, canteen, stores and attached utilities block. Concrete strip and pad foundations, ground slab. Steel portal frame. Rendered block dwarf walls, steel cladding to walls and roof. Double glazed aluminium windows; electric steel roller shutter doors. Block partitions, WC cubicles. Flush doors. Plaster and paint only to walls; special screed, vinyl, carpet and tiles to floors; suspended ceilings. Fittings. Kitchen fitments. Sanitaryware. Oil HW heating. Extract fans, electric light and power. Sprinklers. Burglar and fire alarms, CCTV. Ext works.
Basement 0 m2 Area of External Walls 1,597 m2   
Ground Floor 2,865 m2 Wall to Floor Ratio 0.56% %  
Upper Floors 0 m2 Average Storey Heights

Basement - m   
Gross Floor Area 2,865 m2 Ground - m   

Upper - m   
Usable Area 2,608 m2
Circulation Area 88 m2 Internal Cube - m3   
Ancillary Area 169 m2
Internal Divisions 0 m2 Spaces Not Enclosed - m2   

Gross Floor Area 2,865 m2 Number of Units 1    

 

Analysis
Element  Total Cost   Cost per
 m2 
 Element Unit
Quantity 
 Element Unit
Rate 
 Percent-
 age 
1 Substructure £ 109,079    £ 38.07    2,865  m2    £ 38.07   6 %   
2A Frame £ 122,000    £ 42.58    2,865  m2    £ 42.58   6 %   
2B Upper floors            
2C Roof £ 92,920    £ 32.43    3,041  m2    £ 30.56   5 %   
2D Stairs            
2E External walls £ 45,967    £ 16.04    1,334  m2    £ 34.46   2 %   
2F Windows and external doors £ 35,883    £ 12.52    263  m2    £ 136.44   1 %   
2G Internal walls and partitions £ 37,291    £ 13.02    1,798  m2    £ 20.74   2 %   
2H Internal doors £ 17,930    £ 6.26    51  No    £ 351.57    
2 Superstructure £ 351,991    £ 122.86        19 %   
3A Wall finishes £ 25,360    £ 8.85        1 %   
3B Floor finishes £ 53,020    £ 18.51        2 %   
3C Ceiling finishes £ 21,353    £ 7.45        1 %   
3 Internal finishes £ 99,733    £ 34.81        5 %   
4 Fittings £ 16,215    £ 5.66         
5A Sanitary appliances Included in element 5F
5B Services equipment            
5C Disposal installations Included in element 5F
5D Water installations Included in element 5F
5E Heat source Included in element 5F
5F Space heating and air treatment (includes others) £ 174,000    £ 60.73        9 %   
5G Ventilating systems Included in element 5F
5H Electrical installations £ 150,000    £ 52.36        8 %   
5I Gas installations            
5J Lift and conveyor installations            
5K Protective installations £ 52,200    £ 18.22        2 %   
5L Communications installations            
5M Special installations            
5N Builder's work in connection £ 70,372    £ 24.56        3 %   
5O Builder's profit and attendance            
5 Services £ 446,572    £ 155.87        24 %   
 Building sub-total £ 1,023,590    £ 357.27        56 %   
6A Site works £ 442,112    £ 154.31        24 %   
6B Drainage £ 118,630    £ 41.41        6 %   
6C External services Included in element 5F
6D Minor building works £ 54,858    £ 19.15        3 %   
6 External works £ 615,600    £ 214.87        33 %   
7 Preliminaries £ 131,800    £ 46.00        7 %   
 Total (less Contingencies) £ 1,770,990    £ 618.15        97 %   
8 Contingencies £ 40,000    £ 13.96        2 %   
 Contract sum £ 1,810,990    £ 632.11        100 %   

 

Specification
Element Specification
1 Substructure Excavation in unstable ground. 1995m2 Type 3 crushed rock. Concrete C35/20 in foundation trenches, C40/20 reinforced concrete slab, power float finish, 200mm thick. Reinforced concrete stanchion bases. 215mm precast concrete block walling.
2A Frame PC sum £122000 for single span steel portal frame.
2C Roof BSC Colorcoat steel cladding, insulated core and powder coated inner skin. Translucent rooflights. Kingspan Highline steel gutters. PVC rainwater pipes.
2E External walls Precast concrete block dwarf walls, rendered, with BSC Colorcoat insulated composite metal cladding.
2F Windows and external doors Kawneer 102 series double glazed aluminium windows and external screens; Leaderflush doors. 2No electrically operated steel roller shutters.
2G Internal walls and partitions 10.5N/mm2 precast fairfaced concrete blocks, mainly 215mm. Toilet cubicles.
2H Internal doors 51No 44mm Leaderflush solid core doors in softwood frames.
3A Wall finishes 2 coats Carlite plaster and vinyl emulsion to blockwork.
3B Floor finishes Sealed concrete floor with 2mm Larcote SL or Laybon Sealdeck; 421m2 vinyl flooring; 86m2 ceramic tiles; 261m2 Interface Genesis carpet.
3C Ceiling finishes 1122m2 Armstrong Minaboard Dune suspended ceilings.
4 Fittings Minor shelving, vanity kitchen units, bench seats, reception desk.
5A Sanitary appliances 14No WCs, 15No wash basins, included in 5F.
5C Disposal installations Included in 5F.
5D Water installations Included in 5F.
5E Heat source Included in 5F.
5F Space heating and air treatment PC sum £174000 for 2 boilers, calorifiers, compressors, dryer, air receiver, 2 toilet extract fans, 2 general extract fans, 7 smoke ventilators.
5G Ventilating systems Included in 5F.
5H Electrical installations PC sum £150000 for electric light, power, switchgear and CCTV.
5K Protective installations PC sum £52200 for sprinklers.
5L Communications installations Intruder alarm and fire detection.
5N Builder's work in connection Concrete bases, tank platforms, holes, pipe casings.
6A Site works Grassing; 4462m2 reinforced concrete roads; 4057m2 asphalt roads; 1801m2 macadam paving; 2022m2 macadam footpaths; chain link fencing, rendered block retaining wall with galvanised balustrading.
6B Drainage 2915m2 PVC drain pipes, 110mm diameter; 92No gullies; 44No manholes. Pumping chamber.
6C External services Oil supply, sprinkler mains, water, electricity.
6D Minor building works Security hut, utility building and chemical store with rendered block walls and composite roof panels.
7 Preliminaries 8.04% of remainder of Contract Sum (excluding Contingencies).
8 Contingencies 2.44% of remainder of Contract Sum (excluding Preliminaries).

 

Credits
 Submitted by: Construction Economist
 Client:  
 Supervising Officer:  
 Quantity Surveyor: Building Design Cost Management Associates